DESCRIPTIONS
Expansion of existing bulk ship loading and unloading facility. The scope of work includes Structural Steel construction of flat storage, truck loading towers, truck intake towers, transfer towers, head house, conveyors systems, & supply and installation of hoppers. The project was completed without any shutdowns in the 24 hour operation with limited space.