Dismantling of Baggage Sorting Hall

  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall
  • Dismantling of Baggage Sorting Hall

PROJECT DETAILS

  • Client: ARABTEC - TAV (ATJV)
  • Location: Muharraq, Bahrain

DESCRIPTIONS

Dismantling of the steel structure, roof and wall cladding, electrical systems, switches, cables, lighting, CCTV cameras,  and block works of the baggage handling building (80m X 80m X 9m) at The Bahrain International Airport. Dismantling method and procedures conducted & practiced to efficiently re-erect the structure in a different location at the Bahrain International Airport.